List containing some of the works completed by us in past.

Sr. No PROJECT/SCHEME Division Cost (Millions) Date of Award Date of Completion

ROAD WORKS

National Highway Authority

1 Construction of Road from Gharo to Ketibunder, Package-II Mirpur Sakro to Garho (Km 24+000 to Km 54+000) District Thatta NHA 1,291.75 27-Jul-09 07-Feb-14
2 Rehabilitation/ Up-gradation of Jalalpur Pirwala-Uch Sharif Section of Shujjabad-TMP Road, District Multan, Package-I (Km 00+000 to Km 7+500) HA 792.37 03-Dec-09 17-May-11
3 Package-III, Construction of Sultan Bahoo Bridge over River Chenab Linking Shorkot to Garh Maharaja: Approach Road, Drainage of Erosion Work at Shorkot Side NHA 736.15 10-Sep-11 16-April-16
4 Maintenance (Functional Overlay) Km 0+000 – 26+000 (SBC) N-155 – Larkana Moenjo Daro - Contract No. PM-2018-19-SN-07 NHA 319.98 29-Dec-2022 24-Jun-2023
5 maintenance (structural ovrtlay) work KM 300+000 to KM 311+000 on N-5 NBC (Contract No.Mpm-2016-17-sn-01) NHA 256.47 (revised) 09-Jan-19 11/07/18
6 Contract No. PM-2019-20-SN-01- Maitanance (Structural Overlay ) Between KM 339+00-350+000 (NBC) N-5 Naushahro Feroze-Kandiaro NHA 209.28 30-Nov-22 2-Jun-23
7 Contract No RH-SD-09-4012 127+000 to 132+000 (N-5) Contract No RH-SD-09-4013 132+000 to 137+000 (N-5) NHA 188.62 02-Feb-09 30-Jun-9
8 Maintenance (Functional Overlay) Work B/W Km 1047+000 - 1100+000 NB on N-5 (Contract No. PM-2014-15PS-01) Mainchannu-Sahiwal NHA 176.89 30-Dec-15 30-Jun-16
9 Contract No. PS-PS-08-30-10 KM 91+000 to 98+000 (N-70) Contract No. PS-PS-08-30-11 KM 98+000 to 108+000 (N-70) NHA
(Punjab-South)
74.13 01-Apr-09 01-Oct-09
10 Contract No. EM-PS-10-50-16 Km 60 + 600 (N-70) (Bridge Work Muzaffargarh) NHA
(Punjab-South)
50.14 04-Jun-11 08-May-12

Sindh Coal Authority

11 Contract Package No. SCA/Phase-II/CP-III Near Village Rohiro to Marvi Petrolium at Mithi (Km 41+900 to Km 63+000) SCA, Govt of Sindh 1,139.00 18-Feb-13 17-Aug-14

Provincial Highway Division, Communication & Works Deptt.

12 Rehablitation Widening of Roads under Khadim-e-Punjab Rural Roads Programme (KPRRP) in Distt. Vehari (Package No.26) for the Year 2014-15 C&W Punjab 542.73 11-May-15 Completed
13 Construction of Dual Carriageway from Burewala to Chichawatni road, (Remaining portion) from KM 3.00 to 23.14 Length= 20.14 KM (Section Group-I from KM 3.00 to 13.00= 10.00 KM) in Districct Vehari C&W Punjab 460.62 09-Dec-14 Completed
14 Khadim-e-Punnjab Ruler Roads Programme Phase-III (KPRRP) Package No. 14 District Vehari (34.14 Km) C&W Punjab 333.28 15-Jun-16 Completed
15 Khadim-e-Punjab Ruler Roads Programme Phase-4 (KPRRP) Package No 13 District Vehari (30.66 Km) C&W Punjab 283.82 23-Jan-17 Completed
16 Package No. 5706 Reconstruction & Rehablitation Road from Sujawal Bathoro- Bulri Shah Karim (Km 0+000 to Km 24+500) District Thatta (FERP Loan No. 2742-Pak) C&W Sindh 275.30 2-Aapr-12 25-Jun-13
17 Khadim-e-Punjab Ruler Roads Programme Phase-5 (KPRRP) Package No II District Vehari (22.00 Km) C&W Punjab 239.50 04-Aug-17 Completed
18 W/I of Road Lahore-Kasure-Khuddain-Depalpur-Pakpattan-Vehari-Multan Road Section Gagoo to Burewala from (Group-1 from Km No. 536.93 to 544.63 = 7.70 Km from Gagoo Mandi to Adda Mana More) in District Vehari C&W Punjab 201.10 05-Aug-15 Completed
19 W/I of Metalled Road Adda Sardar Pur to Sial Machine (Remaining Portion), Length=14.36 KM G-I from KM No. 0.00 to 0.85 and 1.46 to 13.72 Length= 13.11 KM in District Khanewal C&W Sindh 144.38 09-Dec-14 Completed
20 Special Repair to Lahore-Kasure-Khuddain-Depalpur-Pakpattan-Vehari-Multan Road (Phase-I 526.47 to 536.93 = 10.46 Km) in District Vehari C&W Punjab 80.97 10-Jun-15 Completed
21 M&R of road from Khabri Graveyard to session court Mile 0/0 - 0/6 = 1.2 Kms I/C M.Structure C&W Sindh 52.28 17-Apr-19 30-Jun-19
22 Construction of Road from Chak No.  225/EB Dhariya to 231/EB, 235/EB, Length=4.50KM in District Vehari C&W Punjab 36.65 16-Oct-14 Completed

Asian Development Bank Schemes, Works & Services Deptt.

23 Sawan Gas Field to Khenwari                          Contract No :- 40711, 40712 & 40713 (ADB)
W&S, Sindh
494.61 25-Jul-07 02-Jan-09
24 Kamrahoo Chanel to Ramzan Aradin Via Saman Bhambhro Begar Aradin (11.83kms) Contract No:- 40717 (ADB)
W&S, Sindh
107.35 11-Jan-08 17-Mar-09
25 Construction of Road from Head Jamrao to Fazal Laghari (ADB)
W&S, Sindh
87.77 17-Jun-05 16-Oct-06
26 Raees Bangul Khan Muree to Village Abdul Haleem Jinjh (5.042 Kms)    Contract No:- 41402 (ADB)
W&S, Sindh
35.72 11/01/08 05-Nov-08

Japanese Assisted Rural Roads Schemes

27 Rural Roads Construction Project-II (Sindh) Laon No. PK-P60, Road No. KA-14 Construction of Road from Sahar Jogi to Nandhi Thari to Qasim Shah and Chattan Shah, Taluka Thari Mirwah (7.15 Kms) District Khairpur JARR Construction Project-II Hyderabad 103.19 05-N0v-12 18-Jul-13
28 Rural Roads Construction Project-II (Sindh) Laon No. PK-P60, Road No. KA-5 Construction ByPass Ranipur Sachal Gate Daraza Gadeji Bridge Minor via Abul Wah Right Bank (6.00 Kms)  District Khairpur JARR Construction Project-II Hyderabad 87.93 29-Mar-13 22-Apr-14
29 Rural Roads Construction Project-II (Sindh) Laon No. PK-P60, Road No. K-34 Agro Pul to Village Choudri Afzal via Mangia Pul, Agro UC Bhelaharo Taluka Gambat, District Khairpur. (7.227 Kms)  JARR Construction Project-II Hyderabad 85.09 3-Feb-11 30-Nov-11
30 Rural Roads Construction Project-II (Sindh) Laon No. PK-P60, Road No. KA-10 Reconditioning of Road from Fakirabad Chodao Road via Faizal Mahar Taluka Kot Diji (8.15 Kms) District Khairpur JARR Construction Project-II Hyderabad 84.59 17-Nov-11 30-Nov-12

Provincial Highway Sindh Works:

31 Construction of Road from Modor to Rohiro Mile 0/0-13/0 (21km) Provincial H/W Div. Sindh 156.52 01-Jan-05 10-Mar-06
32 Construction of Road from Ali Bunder to Nangar Parkar (Ali Bunder to Diplo)              0/0-6/2 10Kms Provincial H/W Div. Sindh 130.19 May-07 May-10
33 Construction of Road from Ali Bunder to Nangar Parkar (Ali Bunder to Diplo)                     6/2-12/4 10Kms Provincial H/W Div. Sindh 122.35 Mar-10 Jun-07
34 Rehabilitaion of Various Road Khairpur (Road from Kot Lalu to Akro Road Mile          0/0 - 7/5  District GoverN. Khairpur 107.90 27-Sep-11 26-Sep-12
35 Construction of Road from Diplo to Islamkot (Bakho to Karkasar) 10 Kms Provincial H/W Div. Sindh 96.98 May-07 April-10
36 Rehabilitaion of Various Road Khairpur (Road from Thari Mirwah to Pir Wassan Mile 0/0 - 6/6  District GoverN. Khairpur 90.34 29-Sep-11 01-Jun-12
37 Construction of Road from Kunri to Chlhar @ Thar Nabisar to Chelhar Mile 2/0-8/1 (9.80Km) Provincial H/W Div. Sindh 78.51 Sep-06 Mar-10

BUILDING WORKS

USAID-Sindh Basic Education Program, Govt. of Sindh

38 Construction of Eight (08) Schools in District Qamber Shahdadkot Package-11 (QSK-II) SBEP (PM&IU) 574.28 07-Feb-17 10-Jun-22
39 Construction of Eight (05) Schools in Karachi (Gadap & Bin Qasim Towns) SBEP-Package-05A (Balance work)  SBEP (PM&IU) 308.22 08-May-17 19-Oct-20

National Highway Works:

40 Contract No TP-PS-08-80-01 at          KM 1080/1081 (N-5) (Harappa Toll Plaza) NHA               (Punjab-South) 80.27 30-Jun-09 25-Jun-10
41 Contract No TP-SD-09-0001 at          KM 487 ~ 488 on Route (N-5) (Sukkur Toll Plaza NHA               (Sindh-Karachi) 61.62 14-Jul-09 31-Dec-10
42 Contract No TP-SD-19-0003 at          KM 25 to KM 26 (Petaro Toll Plaza) on Route (N-55) NHA               (Sindh-Karachi) 47.88 10-Jul-09 Completed

Bahauddin Zakariya University, MULTAN

43 Construction of Veterinary Science Department at B.Z.U. Multan University Engineer, B.Z.U. Multan 187.01 23-Aug-13 15-Nov-15
44 Construction of Boys Hostel at B.Z.U. Multan University Engineer, B.Z.U. Multan 111.51 13-Nov-14 12May-16
45 Construction of Department of Agricultural Engineering at B.Z.U. Multan University Engineer, B.Z.U. Multan 85.83 18-Mar-14 15-Dec-15
46 Construction of Architectural Engineering Extension Building at B.Z.U. Multan University Engineer, B.Z.U. Multan 33.41 21-Jul-14 15-Nov-15

SOLAR POWER/ELECTRICAL WORKS

Agrogreen Pvt Ltd

47 Supply, installation, commissioning, operation and maintenance of 453KW Solar Plant with Solar Electrical Lightining System at M/s Agroogreen Pvt Ltd AGPL 128.83 13-Jan-22 12-Jul-22

AGRICULTURAL WORKS

ON Farm Water Management

48 Installation of Tunnel Farming Complete Job On Turn Key Basis under the Scheme Ïntegrated Water Resource Management in Sindh F-Y 2020-21 Agricultural Dept 415.55 28-Dec-2020 13-Jun-2021

DEVELOPMENT WORKS

ASF FOUNDATION SECRETARIAT

49 Construction of Neelam Block Phase-I (Earth Work & Structure Retaining Wall) at ASF City Project, Karachi ASF 541.33 16-Mar-2019 substantial completed
50 Construction of Neelam Block (Sewerage System) at ASF City Project, Karachi ASF 46.84 06-Sep-2019 28-Feb-23

Capital Development Authority

51 Development Works of Muslim Graveyard in Sector H-11, Phase-II, Islamabad. CDA 40.77 26-Feb-10 25-Oct-10

IRRIGATION WORKS

Rehabilitation/ Remodeling/ Earth Works:

52 Contract No. WSIP/B2/NC.28 Sindh Irrigation & Drainage Authority 47.90 23-Jun-11 31-Mar-13

Pre-Stressed Concrete Bridges Works:

53 Construction of Pre-Stressed Road Bridge over Makhi Farash Link             Canal Phase-II frfom RD-165+295 (Khipro Almanabad Road) 210 Rft Chotiari Reservoir Division Sanghar 35.52 Jul-09 Jan-10

Disaster & Climate Resilience Improvement Project, Lahore

54 Contract No. DCRIP/M3/NCB-03 PIU, Lahore 293.32 14-apr-17 18-Sep-18